+1 407 337 0110 hello@redmeters.com

The Difference is Clear

RM Series 2 in Dredging

  • Determining how much material is pulled onto the dredge.
  • Measuring density of material before and after de-sliming process.
  • Monitoring materials after separation.
  • Determining final density after dewatering stage.
  • Calculating how much material is moved to the vessel hopper (ensuring no over-fill).
  • Measuring materials unloaded from vessel hopper to final destination.
  • Equipment for measuring reprocessing of tailings

About Us

Red Meters innovates the future of understanding in a real-time, continuous manner. Specializing in data monitoring and analytics, the Red Meters vision is to create a density meter alternative with the unmatched quality of our non-nuclear density measurement systems. Built inline with slurry pipelines, the RM Series allows for process automation with +/- 0.25% accuracy over a 6:1 density range. Each RM system is calibrated to NIST, OIML, and ASTM standards, meaning our instruments are smarter, faster, and better for better for your industrial application. Read More.

+1 407 337 0110

sales@RedMeters.com

6520 Pinecastle Blvd

Orlando, FL 32809 USA