Stacked hero

Figure, single-image

Red Meter installed on a hydraulic fracturing slurry line.

Section heading

/ / / Oil and gas

Day-shift density error of 0.605 lb/gal, against 0.302 at night

More than 72 hours of slurry injection on a fracturing rig, 21 to 23 December 2025.

Prose

Section heading

Measured density against the prediction

The Red Meter read specific gravity on the slurry entering the well. The study logged it next to the density predicted from auger inputs, with pressure and flow alongside.

The old practice predicted density from auger speed. Moisture can cake the sand, so the prediction drifts away from the line.

Results table

Section heading

Density error by shift

Recommended window for this job: 105 to 120 psi, maximum 125 psi, ramp 3 to 5 psi/h, flow stability ±0.002. A rising specific gravity with no planned sand increase pointed to material building up in the line.
MetricDayNightChange
Mean pressure108 psi105 psiNight ramp 2.5 to 6.3 psi/h
Mean absolute error0.605 lb/gal0.302 lb/gal50% lower error at night
Flow stability, std. dev.±0.003±0.00233% more stable at night

Call to action

Section heading

Bring us your slurry line

Tell us the density you predict and the density you need.

Button, primary

Book a Demo