Spec table
Section heading
Cement density while the job pumps
| Process variable | Cement slurry density |
|---|---|
| Density accuracy | ±0.5% of full scale |
| Pipe size | 50 to 1000 mm (2 in to 40 in) |
Prose
Section heading
Why your current reading lets you down
Cement density is often a calculated blend or a spot sample. Either one can miss a change in the line while the job is pumping.
Prose
Section heading
Built for your cement line
- A full pipe between flanges, rated for 0 psi and above. Install it horizontal or at up to a 5° incline.
- Operating temperature -10 °C to 120 °C. Storage 0 °C to 80 °C.
Prose
Section heading
Closest field result
Link list
- Download specifications
- Oil and gasDay-shift density error of 0.605 lb/gal, against 0.302 at night, on a frac rig.
- CompareSee how other density measurements compare.
Call to action
Section heading
Bring us your cement line
Tell us your pipe size and what runs through it. We will confirm whether the Red Meter fits and show you the software. You do not need to assemble a group for the first conversation.
Button, primary
Book a Demo