Spec table

Section heading

Cement density while the job pumps

Process variableCement slurry density
Density accuracy±0.5% of full scale
Pipe size50 to 1000 mm (2 in to 40 in)

Prose

Section heading

Why your current reading lets you down

Cement density is often a calculated blend or a spot sample. Either one can miss a change in the line while the job is pumping.

Prose

Section heading

Built for your cement line

  • A full pipe between flanges, rated for 0 psi and above. Install it horizontal or at up to a 5° incline.
  • Operating temperature -10 °C to 120 °C. Storage 0 °C to 80 °C.

Prose

Section heading

Closest field result

Call to action

Section heading

Bring us your cement line

Tell us your pipe size and what runs through it. We will confirm whether the Red Meter fits and show you the software. You do not need to assemble a group for the first conversation.

Button, primary

Book a Demo