Stacked hero

Section heading

/ / / Operations

See the stop before the stop

Your shift needs to know what changed in the pipe. A grab sample answers a different question, and it answers too late.

Prose

Section heading

What your shift sees before the stop

  • Pressure and vibration are recorded with density every second. The meter is not for use below 0 psi; a vacuum relief valve is recommended.
  • Air in the line and bed load show up with the density reading, from the same location.
  • One device at one point replaces three or four instruments that sit in different places and never agree.
  • See it live in Red Meter software, with read-only cloud access from any device. We commission on site and support you remotely, Monday to Friday.

Call to action

Section heading

Bring the last unplanned stop

Tell us what the line was doing and what nobody could see.

Button, primary

Book a Demo